Last week came at last, after long discussions, a witness who should control the improvements from the early summer by a thermography. At the same time, the correct installation of the new hatch to be detected.
The sobering result here again very fast in a collection. The details follow.
- The not sufficiently insulated ring beam which we had the first horse to thank for the bedroom, has still a thermal bridge and is therefore poorly insulated. Rework required.
- In the area of the suspended ceiling in the bathroom and hallway were located at least two new leaks. For this purpose, must now be examined by the loft from the ceiling. Rework required.
- For all the switches for the electric shutter blows the air, that is poorly sealed / insulated. Rework required.
- All shutter boxes have heat bridges, because the soils were fitted to short and left and right are a few millimeters of air is (not tight). Rework required.
- The hatch is now well-insulated and sealed better. So here is (for now) announced clear. is
0 comments:
Post a Comment